Until now my antennas stood on a small mast foot on my flat roof, and they were simply not high enough. The new plan is a 6 m (20 ft) mast. That brings a problem of its own: every time something on it needs attention (a connector, a new antenna, a node that stopped reporting), you do not want to be wrestling a 6 m tube with antennas on top on a roof. So I wanted a base that stands on its own without drilling through the roofing, and that has a hinge, so the mast can be folded down until I can reach the antennas without climbing.
I designed it together with Claude, in one long conversation. I made the design decisions; Claude did the sums, put options side by side, drew up the parts lists and wrote the assembly instructions. This post covers that design process, the welding, the galvanising and getting the result onto the roof.
The brief#
- The building is 7.2 m (24 ft) high, and the mast stands 6.2 m (20 ft) above the roof, so the top ends up at about 13.4 m (44 ft).
- The mast is a steel tube I already had: Ø44 mm (1.7 in), 6 m (20 ft) long.
- On it: a Diamond X-300N dual-band vertical on top, a Vinnant FE403-P 433 MHz ground plane on a short boom at 5.9 m (19 ft), a SenseCAP solar node for Meshcore with its 20 × 19 cm (8 × 7.5 in) panel, and a 220 × 170 × 110 mm (8.7 × 6.7 × 4.3 in) junction box at 5.2 m (17 ft).
- No holes in the roof.
- The mast has to tilt.
No room for an off-the-shelf mount#
The roof is already full. Most of it is covered in solar panels, the outdoor unit of the heat pump sits there, and there are several Solatube daylight tubes and ventilation pipes sticking up through the roofing. A ready-made ballast mount with a fixed footprint would not fit anywhere, so the base had to be designed around what was already there.
I measured the free area between the panels, the heat pump, the tubes and the vents: at most 3.6 × 3.6 m (11.8 × 11.8 ft), and not a clean square either. Every version of the design was checked against those measurements, including the ballast stacks at the arm ends, which take up more room than the steel. Once the base was on the roof, there was about 10 cm (4 in) to spare. A close call.
Wind is the enemy#
With nothing fixed to the roof, the only thing holding the mast up in a storm is ballast. The design wind was chosen for the installation site: Dendermonde lies in wind zone II, and the basic wind speed for that zone, scaled up to a peak gust at the height of the mast top, gives 43.7 m/s (157 km/h, 98 mph). That is well above the strongest gusts usually measured in Belgium (around 140 to 150 km/h, 87 to 93 mph). It gives a dynamic pressure of q = ½ρv² ≈ 1 195 N/m² (25 lb/sq ft). For every part on the mast, Claude worked out the wind force and multiplied it by the height at which it acts:
| Component | Force (N) | Height (m) | Moment (Nm) |
|---|---|---|---|
| Top tube Ø44 mm × 6 m | 379 | 3.0 | 1 137 |
| Horizontal boom | 43 | 5.9 | 254 |
| Diamond X-300N | 269 | 6.2 | 1 668 |
| Vinnant FE403-P | 30 | 5.9 | 177 |
| SenseCAP panel | 58 | 5.9 | 342 |
| Junction box | 66 | 5.2 | 343 |
| Total | 845 | 3 921 |
That is about 845 N (190 lbf) of wind and a tipping moment of about 3 920 Nm (2 890 lbf·ft). With a safety factor of 2, the base has to resist about 7 840 Nm (5 780 lbf·ft). (The calculation during the design counted the Vinnant antenna twice, once more as a separate vertical, and came to 4 063 Nm and 8 126 Nm. Leaving the duplicate out only adds margin.)
Ballast instead of anchors#
The design ballast is twelve concrete kerbstones of 100 × 40 × 6 cm (39 × 16 × 2.4 in), about 57.6 kg (127 lb) each, three on each arm end, 1.5 m (4.9 ft) from the centre. That is 691 kg (1 523 lb) and a restoring moment of 691 × 9.81 × 1.5 ≈ 10 170 Nm (7 500 lbf·ft), about 30% above the requirement. In theory the base should hold until somewhere between 48 and 52 m/s (175 to 187 km/h, 109 to 116 mph).
In the end I did not buy twelve new kerbstones. I used what was lying around in the garden, 100 × 40 × 6 cm and 100 × 20 × 6 cm (39 × 8 × 2.4 in) kerbstones, and topped that up with new 40 × 40 × 4 cm (16 × 16 × 1.6 in) concrete tiles. A tile weighs about 15 kg (33 lb) instead of 57.6 kg, which makes a big difference when you are carrying it across a roof and stacking it. Counted from the photos, the four stacks hold roughly 45 tiles, a dozen narrow kerbstones and five wide ones, comfortably more than the 691 kg of the design.
What matters is where the weight sits. Stones lying on the roof next to the base do nothing; they have to rest on the arm ends, as far out as possible, so they work with the full 1.5 m lever. That is what the T-shaped cross pieces at the ends are for.
One check was not done explicitly during the design: wind from the diagonal. That is the critical direction, because the tipping edge then lies closer to the centre. The 50 cm (20 in) cross pieces at the arm ends widen the base, and with the weight of the steel and the mast added, a rough check comes out at about 9 500 Nm (7 000 lbf·ft), still above the 7 840 Nm needed.
The roof has to carry all of this too: roughly 880 kg (1 940 lb) in total, about 165 kg/m² (34 lb/sq ft) on average. That is well within what an ordinary flat roof carries, but have the strength of your own roof checked. Rubber goes under the steel so it does not cut into the roofing.
From eight arms to a cross#
The base went through a few versions:
- The first idea was to extend my existing 80 × 80 cm (31 × 31 in) mast base with eight arms. That took a lot of material.
- A cross with four arms and a central base plate was simpler and lighter.
- A square frame of 100 × 100 cm (39 × 39 in), 50 cm (20 in) from the centre, stiffens the cross against twisting and bending and shortens the free length of each arm to 80 cm (31 in). The bending stress in a 40 × 40 × 3 tube then comes out at about 33 N/mm², against a yield strength of 235 N/mm² (a factor of about 7), with 12 to 14 mm (about ½ in) of deflection.
- The final shape, which I chose: one continuous 3.0 m (9.8 ft) beam north to south, two 1.48 m (4.9 ft) half beams east to west against a 250 × 250 × 5 mm (10 × 10 × 0.2 in) base plate, and a 50 cm cross piece at each arm end, making a T for the ballast to rest on.
Some material choices along the way:
- Stainless or galvanised steel: stainless was far more expensive. It became S235 steel, hot-dip galvanised afterwards, which should last 30 to 40 years with little maintenance.
- Angle or box section: a closed box section is 10 to 20 times stiffer in torsion than an open angle profile. Box section it was.
- 40 × 40 or 50 × 50: the calculations were done for 40 × 40 × 3 tube. When I ordered the steel I went up to 50 × 50 × 3 mm (2 × 2 × 0.12 in). The difference was small and it gives extra margin.
The hinge#
Claude first proposed a hinge with a guide tube and two vertical plates. I had a simpler idea:
- a horizontal 250 × 250 × 8 mm (10 × 10 × 0.3 in) plate on top of the fixed tube;
- an identical plate under the mast;
- the two plates lie flat on each other, each with four holes, and four M16 class 8.8 bolts clamp them together to lock the mast upright;
- along one edge, bushes are welded onto both plates, and a long bolt with a nut on each end runs through them as the hinge pin.
To lower the mast you take out the four M16 bolts, and the upper plate swings open around the pin, taking the mast with it. It took two ASCII sketches before Claude understood the principle correctly. Then it checked the numbers: the mast weighs about 30 kg (66 lb), the moment while lowering it is about 880 Nm (650 lbf·ft), and lifting it back up takes about 21 kg (46 lb) of force at the top, which is doable with two people. The locking bolts take the wind moment, with a safety factor of about 2.7 with two bolts and more than 5 with all four.
My Visio drawing of the result:
Besides the cross (A, B), the base plate (D) and the T-pieces (E), it shows the frame (C) with four more 1 m (3.3 ft) tubes rising from its corners to a collar around the central tube (F), the gussets (G), the two hinge plates (I), the short spigot (H) that slides into the mast, and the hinge (J).
Working with an AI on this#
Claude was quick at running variants: arm length, profile, material, number of kerbstones. It also produced the parts lists, a plain-text request for quotes, and assembly instructions with a safety checklist. The ideas that made the design simpler came from me: the flat-plate hinge, the T-shaped arm ends and the stripped-down cross. Sketches in ASCII worked much better than describing a shape in words.
It also went wrong in places. The hinge and the beam layout each took three or four rounds of misunderstandings about the geometry. Claude tended to agree enthusiastically where it should have asked a critical question. Its first estimate of the steel weight was about 145 kg (320 lb); recalculated it came to about 59 kg (130 lb). And the diagonal wind direction was not checked until afterwards.
Disclaimer: this is a hobby design with simplified calculations. The wind and pressure coefficients are approximations, and it is not a Eurocode calculation. Have the strength of the roof and the structure checked by a qualified engineer before you build something similar, and only fold the mast down when there is no wind.
Having it made, or making it myself#
My first plan was to have the whole base made and galvanised by a metalworking shop. One shop declined because the job was outside what they normally do; another sent a quote, but for more than I wanted to spend. I can weld, so I bought the steel cut to size from a local supplier and did the rest myself:
- 18 m (59 ft) of 50 × 50 × 3 tube, cut into 1 × 3 000, 2 × 1 480, 8 × 1 000 and 4 × 500 mm;
- a 5 mm plate cut into the 250 × 250 base plate and twelve 100 × 100 mm (4 × 4 in) triangular gussets;
- an 8 mm plate cut into the two 250 × 250 hinge plates;
- four M16 × 50 bolts and lock nuts.
I had the eight 1 m pieces sawn at 45° on both ends. The saw cut eats a few millimetres, so the mitred pieces come out slightly shorter than 1 m, which did not matter here. The supplier had no ready-made solution for the hinge, so I made that part myself from welded-on bushes and a long bolt. The steel was delivered on 23 March.
Welding#
I welded it on the driveway. First the cross: the long beam and the two short ones against the base plate, with the central tube tacked in place and checked for square and plumb.
Four days later the frame, the four sloping legs, the collar and the hinge plate on top were on:
The base comes apart into four pieces of roughly 20 kg (44 lb) each. That matters twice: for the galvanising bath and for getting it onto the roof.
Galvanising#
A steel frame on a roof without corrosion protection does not last, and painting the inside of closed tubes is impossible. Hot-dip galvanising coats the inside and the outside in one go, as long as the zinc can flow in and the air can get out of every tube. Before taking it in, I drilled 10 mm (0.4 in) holes at the critical spots, so the molten zinc can flow in and out and no air gets trapped.
A galvanising plant in Ghent takes small jobs from private customers. You drive in with your trailer, it is weighed on the weighbridge on the way in and on the way out, and you come back when it is done. Their bath is 15.48 m long, 1.48 m wide and 2.5 m deep (51 × 4.9 × 8.2 ft), so a 3 m mast base is a small piece for them, and it went through in a single dip.
On 30 October the weighbridge said 80 kg (176 lb) of steel. That is more than the recalculated 59 kg (130 lb), which was for 40 × 40 tube, so it fits with the heavier 50 × 50 tube, and a lot less than the first estimate of about 145 kg (320 lb). I picked it up again on 18 November.
Getting it on the roof#
The roof edge is 7.6 m (25 ft) above the driveway. Four steel parts of about 20 kg are fine to carry up a ladder; several hundred kilograms of concrete are not. So I hired a moving lift with an operator for an hour. Before booking I checked with the lift firms:
- whether the 3 m (9.8 ft) beam fits on the platform or can be strapped to the ladder;
- the maximum load per trip (from 150 kg to well over 200 kg, 330 to 440+ lb, depending on the lift; one firm warned that many heavy trips in a row can overheat the motor);
- whether the platform reaches over a roof edge at 7.6 m, so we could unload straight onto the flat roof;
- that the lift could stand on our own driveway, so no parking ban on the street was needed.
On 25 November the lift was set up on the driveway at half past twelve, with the ladder resting on the roof edge.
Loading at the bottom and unloading at the top was up to us. The mast tube and the steel went up first, then the stones, a few per trip:
On the roof the stones were spread out right away instead of being piled up at the roof edge, so there was never a concentrated load in one spot. Within the hour everything was up.
On the roof#
The base is bolted together and sits on rubber, with stacks of concrete kerbstones and slabs on the four T-ends. The mast tube already sits on the spigot, folded down, with the upper hinge plate standing upright:
The next step is fitting the antennas, the boom, the node and the junction box while the mast is lying down, then swinging it up and putting in the four bolts. Cables need enough slack to follow the mast when it folds, and they run outside the hinge plates. Quick-disconnect connectors at the base will make lowering it a lot easier, and the hinge pin gets a bit of grease once a year.
Resources#